Production Title: Because I do music video
Date: 23/10/13
Location
|
Risk
|
Who is at risk?
|
Level of Risk
|
Control Measures
|
Park
|
Ground being damp and people falling over
|
Actors and crew
|
medium
|
Try to film on a dry day where the grass won’t be too slippery
|
Park
|
Uneven ground/pavement
|
Actors and crew
|
medium
|
Try to find even flooring and if not make sure everyone is aware and being careful
|
Girls Bedroom
|
Wires
|
Actors and Crew
|
High
|
Collect all wires together or us a mat to cover them. Make sure everyone is aware of where they are
|
Girls Bedroom
|
Props lying on the floor
|
Actress
|
Medium
|
Make sure the is aware where they are on the floor whilst filming
|
Girls Bedroom
|
Low ceiling in area’s, people may hit their heads
|
Actors and Crew
|
Medium
|
Make everyone aware and try not to film in them
|
Street
|
Damp Floor
|
Actors and Crew
|
Medium
|
Film on a dry day
|
Street
|
Uneven Flooring
|
Actors and Crew
|
Medium
|
Find an areas with even flooring and make sure everyone is aware
|
Street
|
Cars
|
Actors and Crew
|
Low
|
Everyone cross at the same time and always look
|
No comments:
Post a Comment